GöcekEVA teak

EVA teak deck on a RIB

Cleaning back a RIB’s failed deck covering and laying EVA teak cut to the template.

New EVA teak deck on a RIB

Situation

The RIB’s old deck covering had lifted, leaving adhesive residue underneath.

Method

We removed the old covering and all residue, took a template of the deck, CNC-cut the EVA teak and bonded it down.

Result

The RIB was delivered in three days with a new non-slip, easy-to-clean deck. 12-month warranty on workmanship and materials.

Step by step

Before: lifted covering · EVA teak deck on a RIB
01 Before: lifted covering
Cleaned surface · EVA teak deck on a RIB
02 Cleaned surface
EVA teak laid · EVA teak deck on a RIB
03 EVA teak laid
New EVA teak deck on a RIB
04 Handover

Yacht names are not published, to respect owners’ privacy.

For captains, owners and yacht managers

Send a photo.
Get a quote.

A few photos and two lines are enough. We send a first assessment within two working days and an itemised quote after the survey.

+90 (543) 104 58 00
WhatsApp